SAFETY SUBMITTALS

Fireproofing Safety Submittels

Safety Submittals Cementicious Fireproofing

Submittal #1 - Cementitious Fireproofing (SFRM)

🔨 SAFETY SUBMITTAL PACKAGE

Submittal #1 - Cementitious Fireproofing (SFRM)

📋 Scope of Work

📏 Applicable Standards

StandardRequirement
29 CFR 1926.1153
29 CFR 1910.134
29 CFR 1926.501
29 CFR 1910.151(c)
29 CFR 1926.57

⚠️ Hazard Controls Summary

HazardControl Method
Silica dust
Alkaline burns (pH 12-13)
Slips on wet overspray
Falls from height
High noise (spray rig 85-95 dBA)

🛡️ Required PPE

🌿 Environmental Controls

👤 Competent Person

📎 Attachments

Fill all fields, then use Print → Save as PDF to generate fillable PDF record.

safety submittals Intumescent Fireproofing (IFRM)

Submittal #2 - Intumescent Fireproofing (IFRM)

🔥 SAFETY SUBMITTAL PACKAGE

Submittal #2 - Intumescent Fireproofing (IFRM)

📋 Scope of Work

📏 Applicable Standards

StandardRequirement
29 CFR 1910.106
29 CFR 1910.134
29 CFR 1910.106(e)(6)(ii)
29 CFR 1926.352
29 CFR 1910.151(c)

⚠️ Hazard Controls Summary

HazardControl Method
Solvent vapors (VOCs)
Flammable liquids (flash point 40-77°F)
Skin absorption (xylene, toluene)
Fire from sparks
Injection injury

🛡️ Required PPE

🛢️ Flammable Liquid Storage

🔥 Fire Watch Requirements

RequirementDetail
When required
Duration
Extinguisher

👤 Competent Person

📎 Attachments

Fill all fields, then use Print → Save as PDF to generate fillable PDF record.

safety submittals Fireproofing Board Installation

Submittal #3 - Fireproofing Board Installation

📦 SAFETY SUBMITTAL PACKAGE

Submittal #3 - Fireproofing Board Installation

📋 Scope of Work

📏 Applicable Standards

StandardRequirement
29 CFR 1910.132
29 CFR 1910.133
29 CFR 1910.138
29 CFR 1926.501