qUALITY CONTROL PLAN

Fireproofing Safety Submittels

 QUALITY CONTROL PLAN

Quality Control Plan (QCP) - Fireproofing Operations

📋 QUALITY CONTROL PLAN (QCP)

Fireproofing Operations — ASTM E736, E605, IBC Chapter 7

1. Purpose & Scope

1.1 Purpose

1.2 Scope

1.3 Applicable Standards

StandardDescription
ASTM E736
ASTM E605
ASTM E119
UL 263
IBC Chapter 7
ACI 514
Manufacturer Specifications

2. Quality Control Responsibilities

RoleResponsibility
Project Manager
QC Inspector
Superintendent
Applicator

3. Pre-Application Quality Checks

3.1 Material Receiving & Storage

CheckRequirementVerified By
Material matches approved submittal
Batch numbers recorded
SDS received and reviewed
Material expiration date
Storage conditions

3.2 Substrate (Steel) Preparation

CheckRequirementVerified By
Steel clean and dry
Surface profile
Primer applied (if required)
Steel temperature
Ambient temperature
Relative humidity

3.3 Equipment Setup

CheckRequirementVerified By
Spray rig calibrated
Hoses inspected
Mixer clean
WFT gauge available

4. In-Process Quality Control (During Application)

4.1 Application Parameters

ParameterRequirementFrequencyVerified By
Wet Film Thickness (WFT)
Coverage rate
Number of passes
Drying time between coats

4.2 Environmental Monitoring

ParameterRequirementFrequencyVerified By
Steel temperature
Ambient temperature
Relative humidity
Dew point

5. Post-Application Quality Control (After Curing)

5.1 Dry Film Thickness (DFT) Testing

ParameterRequirementFrequencyVerified By
DFT
Test locations
Acceptance criteria

5.2 Adhesion Testing (Pull-off)

ParameterRequirementFrequencyVerified By
Pull-off strength
Failure mode

5.3 Visual Inspection

CheckRequirementVerified By
No cracks, spills, or delamination
No bare steel visible
No contamination
Uniform color and texture

6. Non-Conformance & Corrective Action

6.1 Non-Conformance Categories

CategoryDefinitionAction
Minor
Major
Critical

6.2 Non-Conformance Report (NCR)

8. Daily Fireproofing Application Log Template

9. Approval Signatures

✅ Fillable Quality Control Plan — Complete all sections, then use Print → "Save as PDF" to generate a permanent record. This QCP is specific to fireproofing operations per ASTM standards.