4. In-Process Quality Control (During Application)
4.1 Application Parameters
Parameter
Requirement
Frequency
Verified By
Wet Film Thickness (WFT)
Coverage rate
Number of passes
Drying time between coats
4.2 Environmental Monitoring
Parameter
Requirement
Frequency
Verified By
Steel temperature
Ambient temperature
Relative humidity
Dew point
5. Post-Application Quality Control (After Curing)
5.1 Dry Film Thickness (DFT) Testing
Parameter
Requirement
Frequency
Verified By
DFT
Test locations
Acceptance criteria
5.2 Adhesion Testing (Pull-off)
Parameter
Requirement
Frequency
Verified By
Pull-off strength
Failure mode
5.3 Visual Inspection
Check
Requirement
Verified By
No cracks, spills, or delamination
No bare steel visible
No contamination
Uniform color and texture
6. Non-Conformance & Corrective Action
6.1 Non-Conformance Categories
Category
Definition
Action
Minor
Major
Critical
6.2 Non-Conformance Report (NCR)
8. Daily Fireproofing Application Log Template
9. Approval Signatures
✓ Fully reusable Quality Control Plan — fill once, print, then clear and reuse unlimited times. Buttons use event delegation and will never break regardless of how many times you use them.