INSPECTION AND TEST PLAN (ITP)

Fireproofing Safety Submittels

INSPECTION AND TEST PLAN (ITP)

Inspection and Test Plan (ITP) - Fireproofing Operations | Reusable Template

🔍 INSPECTION AND TEST PLAN (ITP)

Fireproofing Operations — ASTM E605, E736, IBC Chapter 7

1. Purpose

2. ITP Matrix — Fireproofing Operations

# Activity Inspection / Test Acceptance Criteria Frequency Responsibility Witness / Hold
1 Material Receiving Verify product, batch, expiration
2 Material Storage Temp, humidity, off concrete
3 Surface Preparation Clean, dry, no rust/oil
4 Primer Application (if required) DFT, coverage
5 Steel Temperature Min/max per manufacturer
6 Ambient Temp / Humidity Min/max per manufacturer
7 Equipment Calibration Pressure, nozzle, flow
8 Wet Film Thickness (WFT) Max per pass
9 Coverage Rate ft²/gal or ft²/bag
10 Visual — During Application No slump, runs, gaps
11 Environmental Monitoring Steel temp, air temp, RH
12 Dry Film Thickness (DFT) Per ASTM E605
13 Visual Inspection — Final No defects, cracks, spalls
14 Density Test (cementitious) Per ASTM E605
15 Adhesion Test (pull-off) Per ASTM E736
16 Final Acceptance All tests passed

3. Hold Points & Witness Points

Definitions:
Hold Point: Work cannot proceed without inspection. Notify GC/Inspector; wait for approval.
Witness Point: Inspection required; work may continue but inspector must be present.

3.1 Hold Points (Work Stops)

#Hold PointNotification TimeApproval Required From
1Material receiving
2Primer application
3Adhesion testing
4Final acceptance

3.2 Witness Points (Inspection Required)

#Witness PointNotification Time
1Surface preparation
2DFT testing
3Density testing (if required)

4. Inspection & Test Equipment

EquipmentCalibration RequiredFrequencyCalibration Due
WFT gauge (comb)NoReplace when wornN/A
DFT gauge (electronic)YesAnnual
Pull-off adhesion testerYesAnnual
Infrared thermometerYesAnnual
Hygrometer / thermometerYesAnnual

5. ITP Log Entry

6. Non-Conformance & Corrective Action (ITP Integration)

StepActionResponsible
1Fail inspection or testQC Inspector
2Issue Non-Conformance Report (NCR)QC Inspector
3Notify Superintendent and GCQC Inspector
4Determine root causeSuperintendent
5Implement corrective actionApplicator
6Re-inspectQC Inspector
7Close NCRSuperintendent

7. Inspection & Test Record Retention

RecordRetentionResponsible
Completed ITP LogsProject duration + 5 years
Calibration certificatesCurrent + 1 year after expiration
Third-party test reportsPermanent
Non-Conformance ReportsProject duration + 5 years

8. Approval Signatures

✓ Fully reusable Inspection and Test Plan — fill once, print, then clear and reuse unlimited times. Buttons use event delegation and will never break regardless of how many times you use them. Hold points require work stoppage until inspection approval is received.